Upcoming Impacts
Hepner Hall - From 10/10/2024 to 12/12/2024
Oct 10Construction personnel will need to occupy Electrical Room 13 for the duration of the work. Additionally, construction traffic will occur within Room 10SE within the Hepner Hall building basement. Please note that this work may generate localized dust and noise. Efforts will be made to coordinate dust/noise impacts around occupied room schedules.
Mediterranean Garden - From 10/10/2024 to 12/12/2024
Oct 10Construction personnel will need to occupy Electrical Room 13 for the duration of the work. Additionally, construction traffic will occur within Room 10SE within the Hepner Hall building basement. Please note that this work may generate localized dust and noise. Efforts will be made to coordinate dust/noise impacts around occupied room schedules.
Cogeneration Plant, Facilities Services (FS), FS Boiler Shop – Building Outage - 10/10/2024
Oct 10As part of the campus electrical upgrades project, a short planned electrical outage for the buildings is required. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window.
UPDATE - Loss of Redundancy in Power Generation - All Campus - On 10/10/2024
Oct 10Occupants should be aware that normal cogeneration redundancy will be temporarily unavailable for the full campus. Although the likelihood of a utility interruption during this maintenance period is low while the campus is utilizing power from SDG&E, it is recommended that any sensitive equipment be shut down prior to the scheduled maintenance period in an abundance of caution.
Loss of Redundancy in Power Generation - All Campus - On 10/10/2024
Oct 10Occupants should be aware that normal cogeneration redundancy will be temporarily unavailable for the full campus. Although the likelihood of a utility interruption during this maintenance period is low while the campus is utilizing power from SDG&E, it is recommended that any sensitive equipment be shut down prior to the scheduled maintenance period in an abundance of caution.
Loss of Redundancy in Power Generation - Substation B - On 10/08/2024
Oct 8Occupants should be aware that normal cogeneration redundancy will be temporarily unavailable for Substation B. Although the likelihood of a utility interruption during this maintenance period is low while the campus is utilizing power from SDG&E, it is recommended that any sensitive equipment be shut down prior to the scheduled maintenance period in an abundance of caution.
All Campus Users - From 10/07/2024 to 02/05/2025
Oct 7The relocation of the SDG&E electrical pole to the Engineering Building courtyard will require the courtyard to be temporarily closed with construction fencing. The courtyard closure will impact the ADA path of travel through the courtyard, but other alternate ADA paths of travel will remain accessible. During active construction for relocation of the pole, the following impacts are anticipated: • For potholing and augering activities, a number of ADA parking spots in the Engineering Building lot will be temporarily closed for one day. • The parking lot behind the GMCS Building will be temporarily closed to accommodate construction truck parking and equipment traffic for one day. • Single lane closure in a portion of Aztec Circle to safely relocate the SDG&E pole to the Engineering Building courtyard. Thru traffic will be maintained. Please heed the directions and instructions of signage and flaggers in the area.
Hardy Tower (HT), Life Sciences North (LSN), Life Sciences South (LSS), Donald P. Shiley Bioscience Center (BSCI), and Engineering (ENG) - From 10/07/2024 to 12/13/2024
Oct 7Due to ongoing electrical upgrades in the Life Sciences South (LSS), construction trucks and equipment will intermittently park near the Vegetation Garden between LSN and LSS. Construction fencing housing the temporary transformer will be set up near the existing electrical enclosure at LSS. Please be advised that work will result in localized dust and noise.
Life Sciences South - From 10/07/2024 to 12/13/2024
Oct 7Work will require construction personnel to occupy equipment rooms 194, 194A, 195 & 195A. Please be advised that work will result in localized dust and noise, but there are no anticipated impacts to any building systems.
Donald P. Shiley Bioscience Center (BSCI) - From 9/16/2024 to 11/8/2024
Sep 16Construction personnel will occupy electrical room 2A for the duration of the work. Additionally, construction traffic will occur within the Physics Workshop/Storage Room 1 and the service elevator to the basement. However, hallway access for occupants will be maintained. Please note that this work may generate localized dust and noise.