Previous Notifications

Impact Notifications are Listed Chronologically

  • Electrical Infrastructure Upgrade Notification

    UPDATE - Engineering Room 216A - On 09/13/2024

    The demolition of damaged floor tiles and installation of new floor tiles in Engineering Building Room 216A will result in construction traffic throughout the duration of the work. Please be advised that this will cause localized dust and odors, but there are no anticipated impacts to any building systems.

  • Electrical Infrastructure Upgrade Notification

    Engineering Room 216A - On 09/06/2024

    The demolition of damaged floor tiles and installation of new floor tiles in Engineering Building Room 216A will result in construction traffic throughout the duration of the work. Please be advised that this will cause localized dust and odors, but there are no anticipated impacts to any building systems.

  • Electrical Infrastructure Upgrade Notification

    Art I South Room 469C - On 09/06/2024

    The concrete pour for the transformer pad in electrical room 469C will result in minor impacts, including the presence of construction personnel, localized dust, and noise. However, there are no significant impacts expected for occupants, nor are there any anticipated outages to building systems.

  • Electrical Infrastructure Upgrade Notification

    REMINDER - Hardy Tower and Professional Studies & Fine Arts - Building Outages - On 09/04/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the buildings is required. There will be periodic construction personnel traffic in and around the buildings throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outage only impacts systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Please also note that the buildings will be closed to the public throughout the outage window detailed below. ** Start Time / Date: 04:00 AM, Wednesday, September 4, 2024 End Time / Date: 06:00 AM, Wednesday, September 4, 2024

  • Electrical Infrastructure Upgrade Notification

    Hardy Tower and Professional Studies & Fine Arts - Building Outages - On 09/04/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the buildings is required. There will be periodic construction personnel traffic in and around the buildings throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outage only impacts systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Please also note that the buildings will be closed to the public throughout the outage window detailed below. ** Start Time / Date: 04:00 AM, Wednesday, September 4, 2024 End Time / Date: 06:00 AM, Wednesday, September 4, 2024

  • Electrical Infrastructure Upgrade Notification

    Art I South - Building Outages - On 09/04/2024 and 09/24/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Art I South building is required. There will be periodic construction personnel traffic in and around the Art I South building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. The steam pumps located in room 469 will also be shut down during the outage. It is highly recommended that sensitive equipment unable to withstand an outage be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Art I South building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Wednesday, September 4th, 2024, from 12:00 am to 8:00 am 2. On Tuesday, September 24th, 2024, from 3:30 am to 7:30 am

  • Electrical Infrastructure Upgrade Notification

    REMINDER - Art I South - Building Outages - On 09/04/2024 and 09/24/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Art I South building is required. There will be periodic construction personnel traffic in and around the Art I South building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. The steam pumps located in room 469 will also be shut down during the outage. It is highly recommended that sensitive equipment unable to withstand an outage be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Art I South building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Wednesday, September 4th, 2024, from 12:00 am to 8:00 am 2. On Tuesday, September 24th, 2024, from 3:30 am to 7:30 am

  • Electrical Infrastructure Upgrade Notification

    REMINDER II - Art I South - Building Outages - On 09/04/2024 and 09/24/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Art I South building is required. There will be periodic construction personnel traffic in and around the Art I South building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. The steam pumps located in room 469 will also be shut down during the outage. It is highly recommended that sensitive equipment unable to withstand an outage be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Art I South building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Wednesday, September 4th, 2024, from 12:00 am to 8:00 am 2. On Tuesday, September 24th, 2024, from 3:30 am to 7:30 am

  • Electrical Infrastructure Upgrade Notification

    Aztec Bookstore and Education – Planned Electrical Outages - On 08/23/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Aztec Bookstore and Education buildings is required. There will be periodic construction personnel traffic in and around the Aztec Bookstore Electrical Yard throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Aztec Bookstore and Education buildings will be closed to the public throughout the outage window detailed below. ** Duration of Impacts: Start Time / Date: 03:30 AM, Friday, August 23rd, 2024 End Time / Date: 07:30 AM, Friday, August 23rd, 2024

  • Electrical Infrastructure Upgrade Notification

    REMINDER - Aztec Bookstore and Education – Planned Electrical Outages - On 08/23/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Aztec Bookstore and Education buildings is required. There will be periodic construction personnel traffic in and around the Aztec Bookstore Electrical Yard throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Aztec Bookstore and Education buildings will be closed to the public throughout the outage window detailed below. ** Duration of Impacts: Start Time / Date: 03:30 AM, Friday, August 23rd, 2024 End Time / Date: 07:30 AM, Friday, August 23rd, 2024