Art II North - From 04/30/2024 to 08/07/2024
Apr 30Work will require construction personnel to occupy rooms equipment rooms 104A, 200, 200A, and 318A, as well as ceiling spaces in rooms 104, 104B, 202, 202C, 202D, 206, and 318 throughout the duration of work. Please be advised that work will result in localized dust and noise, but there are no anticipated impacts to any building systems. Any work within specific occupied spaces will continue to be coordinated with room users prior to the work taking place.
UPDATE - Art II North - From 04/30/2024 to 08/07/2024
Apr 30Work will require construction personnel to occupy rooms equipment rooms 104A, 200, 200A, and 318A, as well as ceiling spaces in rooms 104, 104B, 202, 202C, 202D, 206, and 318 throughout the duration of work. Please be advised that work will result in localized dust and noise, but there are no anticipated impacts to any building systems. Any work within specific occupied spaces will continue to be coordinated with room users prior to the work taking place.
Canyon Crest Drive - From 04/22/2024 to 04/26/2024
Apr 22Fence installation will require vehicular traffic on Canyon Crest Drive to be intermittently limited to one alternating thru-lane for both directions of travel. Traffic will be directed by signage, flagmen and traffic control to ensure thru-traffic is safely maintained while work is being conducted above Canyon Crest Drive. Proactive precautions will be in place to avoid falling debris from impacting the road below, but drivers are advised to please heed all signage and flaggers who will be monitoring conditions throughout the duration of work.
Canyon Crest Drive - From 04/01/2024 to 04/03/2024
Apr 1Fence removal will require vehicular traffic on Canyon Crest Drive to be intermittently limited to one alternating thru-lane for both directions of travel. Traffic will be directed by signage, flagmen and traffic control to ensure thru-traffic is safely maintained while work is being conducted above Canyon Crest Drive. Proactive precautions will be in place to avoid falling debris from impacting the road below, but drivers are advised to please heed all signage and flaggers who will be monitoring conditions throughout the duration of work.
UPDATED - Engineering - From 04/01/2024 to 08/02/2024
Apr 1Please be advised that the end date and time for the work have been extended. In addition to all previously communicated information, a portable construction restroom will be installed in front of room 122D for construction personnel. Any work within specific occupied spaces will continue to be coordinated with room users prior to the work taking place.
Physics - From 02/29/2024 to 03/04/2024
Feb 29Installation of fire alarm conduits will necessitate construction personnel to occupy electrical and mechanical rooms 32, 32B, 32D, 33 and 33C throughout the duration of work. Work will not cause any shutdown or outages to any building systems. Please be advised that work will result in localized dust and noise.
Donald P. Shiley Bioscience Center’s Covered Breezeway & North Life Sciences Electrical Room - From 02/15/2024 to 02/16/2024
Feb 15Medium voltage cable pulling work occurring through the Donald P. Shiley Bioscience Center’s covered breezeway and Life Sciences North (LSN)’s electrical room will require access to the LSN loading dock will be temporarily closed during active construction hours. Deliveries to LSN, Life Sciences South (LS S) and the Donald P. Shiley Bioscience Center will need to be directed to the south side of LSN. Access to the Biohazardous Waste Disposal Location, situated in the cage to the East of the Donald P. Shiley Bioscience Center (BSCI), will also be limited during construction hours. Access to disposal area is available outside of active construction activity hours. Otherwise, arrangements can be coordinated with Alejandro Rivera at (858)248-5739 or [email protected]. There are no electrical or other building utility service interruptions anticipated. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive - From 02/12/2024 to 03/31/2024
Feb 12Medium voltage cable pulling work will intermittently impact vehicular and/or pedestrian access on Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the West end of the Driveway. There are no electrical or other building utility service interruptions anticipated. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive - From 02/12/2024 to 04/05/2024
Feb 12Medium voltage cable pulling work will intermittently impact vehicular and/or pedestrian access on Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the West end of the Driveway. There are no electrical or other building utility service interruptions anticipated. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive & Facilities Services North Driveway - 01/15/2024 - 01/19/2024
Jan 15Medium voltage cable pulling work will limit vehicular access on the Northern end of Aztec Circle Drive to the West lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services through the East end of the driveway will be limited to small trucks and cars, with all other vehicle access maintained through the West end of the Driveway. Please be advised that work will result in localized dust and noise.