Previous Notifications
Impact Notifications are Listed Chronologically
Donald P. Shiley Bioscience Center’s Covered Breezeway & North Life Sciences Electrical Room - From 02/15/2024 to 02/16/2024
Feb 15Medium voltage cable pulling work occurring through the Donald P. Shiley Bioscience Center’s covered breezeway and Life Sciences North (LSN)’s electrical room will require access to the LSN loading dock will be temporarily closed during active construction hours. Deliveries to LSN, Life Sciences South (LS S) and the Donald P. Shiley Bioscience Center will need to be directed to the south side of LSN. Access to the Biohazardous Waste Disposal Location, situated in the cage to the East of the Donald P. Shiley Bioscience Center (BSCI), will also be limited during construction hours. Access to disposal area is available outside of active construction activity hours. Otherwise, arrangements can be coordinated with Alejandro Rivera at (858)248-5739 or [email protected]. There are no electrical or other building utility service interruptions anticipated. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive - From 02/12/2024 to 03/31/2024
Feb 12Medium voltage cable pulling work will intermittently impact vehicular and/or pedestrian access on Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the West end of the Driveway. There are no electrical or other building utility service interruptions anticipated. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive - From 02/12/2024 to 04/05/2024
Feb 12Medium voltage cable pulling work will intermittently impact vehicular and/or pedestrian access on Aztec Circle Drive, Facilities Services North Driveway, Avenue of the Arts, Bioscience Breezeway, Planetarium Court, and Canyon Crest Drive. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the West end of the Driveway. There are no electrical or other building utility service interruptions anticipated. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive & Facilities Services North Driveway - 01/15/2024 - 01/19/2024
Jan 15Medium voltage cable pulling work will limit vehicular access on the Northern end of Aztec Circle Drive to the West lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services through the East end of the driveway will be limited to small trucks and cars, with all other vehicle access maintained through the West end of the Driveway. Please be advised that work will result in localized dust and noise.
UPDATE - Aztec Circle Drive & Facilities Services North Driveway - 01/15/2024 - 02/09/2024
Jan 15Medium voltage cable pulling work will limit vehicular access on the Northern end of Aztec Circle Drive to the West lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services through the East end of the driveway will be limited to small trucks and cars, with all other vehicle access maintained through the West end of the Driveway. Please be advised that work will result in localized dust and noise.
UPDATE - Avenue of the Arts & Facilities Services North Driveway - 01/11/2024 - 02/09/2024
Jan 11Medium voltage cable pulling work will require vehicular access on Avenue of the Arts to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the East end of the Driveway. Please be advised that work will result in localized dust and noise.
UPDATE - Avenue of the Arts & Facilities Services North Driveway - 01/11/2024 - 01/19/2024
Jan 11Medium voltage cable pulling work will require vehicular access on Avenue of the Arts to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the East end of the Driveway. Please be advised that work will result in localized dust and noise.
Avenue of the Arts & Facilities Services North Driveway - 01/08/2024 - 01/12/2024
Jan 8Medium voltage cable pulling work will require vehicular access on Avenue of the Arts to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the East end of the Driveway. Please be advised that work will result in localized dust and noise.