Administration, Art (I) South, Art (II) North, Arts and Letters, Atkinson Hall, Aztec Bookstore, Building A, Bioscience Center, Charles B. Bell Jr. Pavilion, Chemical Sciences Lab, Education, Engineering, Engineering & Interdisciplinary Sciences, Facilities Services Boiler Shop, Faculty Staff Club, Geology Math and Computer Science, Hardy Tower, Hazmat Building, Hepner Hall, Life Sciences North, Life Sciences South, Lot 16, Marquee Sign, Nasatir Hall, North Education, Physics, Physics-Astronomy, Physical Sciences, Professional Studies and Fine Arts, and Storm Complex Building – 12/19/2024
Dec 19Please be aware that ongoing testing in the cogeneration plant may result in up to three brief utility service interruptions within the timeframe indicated below. In the unlikely scenario where an interruption may occur, each interruption would not be expected to last longer than 20 minutes at a time. While the likelihood of interruptions is low, we recommend frequently saving your work, shutting down or unplugging sensitive equipment, and scheduling any critical tasks that cannot tolerate an interruption outside the testing window as a precaution. If you have questions or would like more details about potential impacts and recommended measures to prepare for potential utility impacts, please use the contact information provided below.
UPDATE - Administration, Art (I) South, Art (II) North, Arts and Letters, Atkinson Hall, Aztec Bookstore, Building A, Bioscience Center, Charles B. Bell Jr. Pavilion, Chemical Sciences Lab, Education, Engineering, Engineering & Interdisciplinary Sciences, Facilities Services Boiler Shop, Faculty Staff Club, Geology Math and Computer Science, Hardy Tower, Hazmat Building, Hepner Hall, Life Sciences North, Life Sciences South, Lot 16, Marquee Sign, Nasatir Hall, North Education, Physics, Physics-Astronomy, Physical Sciences, Professional Studies and Fine Arts, and Storm Complex Building – 12/19/2024
Dec 19Please be aware that ongoing testing in the cogeneration plant may result in up to three brief utility service interruptions within the timeframe indicated below. In the unlikely scenario where an interruption may occur, each interruption would not be expected to last longer than 20 minutes at a time. While the likelihood of interruptions is low, we recommend frequently saving your work, shutting down or unplugging sensitive equipment, and scheduling any critical tasks that cannot tolerate an interruption outside the testing window as a precaution. If you have questions or would like more details about potential impacts and recommended measures to prepare for potential utility impacts, please use the contact information provided below.
UPDATE - Administration Building – Planned Electrical Outages - From 12/04/2024 to 01/17/2025
Dec 4As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be either unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outages only impact systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Also note that the building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Wednesday, December 4th, 2024, from 12:00 am to 8:00 am 2. On Friday, December 20th, 2024, from 3:30 am to 7:30 am 3. On Wednesday, January 22nd, 2025, from 3:30 am to 7:30 am
Administration Building – Planned Electrical Outages - From 12/04/2024 to 01/22/2025
Dec 4As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be either unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outages only impact systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Also note that the building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Wednesday, December 4th, 2024, from 12:00 am to 8:00 am 2. On Friday, December 20th, 2024, from 3:30 am to 7:30 am 3. On Wednesday, January 22nd, 2025, from 3:30 am to 7:30 am
Geology Mathematics and Computer Science (GMCS) - 12/04/2024
Dec 4Due to a scheduled crane pick activity to place a transformer in the GMCS parking lot, the GMCS building will be temporarily closed to building users during the timeframe specified below.
REMINDER - Geology Mathematics and Computer Science (GMCS) Building – Planned Electrical Outages - From 12/04/2024 to 12/20/2024
Dec 4As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be either unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the building will be closed to the public throughout the outage windows detailed below. **
Geology Mathematics and Computer Science (GMCS) Building – Planned Electrical Outages - From 12/04/2024 to 12/20/2024
Dec 4As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be either unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the building will be closed to the public throughout the outage windows detailed below. **
REMINDER - Administration Building – Planned Electrical Outages - From 12/04/2024 to 01/22/2025
Dec 4As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be either unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outages only impact systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Also note that the building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Wednesday, December 4th, 2024, from 12:00 am to 8:00 am 2. On Friday, December 20th, 2024, from 3:30 am to 7:30 am 3. On Wednesday, January 22nd, 2025, from 3:30 am to 7:30 am
REMINDER III - Physical Sciences - Building Outages - On 12/03/2024
Dec 3As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outages, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Physical Sciences Building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Tuesday, October 15th, 2024, from 4:00 am to 6:00 am 2. On Tuesday, November 26th, 2024, from 4:00 am to 6:00 am 3. On Tuesday, December 3rd, 2024, from 4:00 am to 6:00 am
REMINDER II - Physical Sciences - Building Outages - On 11/26/2024 and 12/03/2024
Nov 26: As part of the campus electrical upgrades project, planned electrical outages for the building are required. There will be periodic construction personnel traffic in and around the building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outages, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Physical Sciences Building will be closed to the public throughout the outage windows detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Tuesday, October 15th, 2024, from 4:00 am to 6:00 am 2. On Tuesday, November 26th, 2024, from 4:00 am to 6:00 am 3. On Tuesday, December 3rd, 2024, from 4:00 am to 6:00 am