  • Electrical Infrastructure Upgrade Notification

    Aztec Bookstore and Education – Planned Electrical Outages - On 08/23/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Aztec Bookstore and Education buildings is required. There will be periodic construction personnel traffic in and around the Aztec Bookstore Electrical Yard throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Aztec Bookstore and Education buildings will be closed to the public throughout the outage window detailed below. ** Duration of Impacts: Start Time / Date: 03:30 AM, Friday, August 23rd, 2024 End Time / Date: 07:30 AM, Friday, August 23rd, 2024

  • Electrical Infrastructure Upgrade Notification

    REMINDER - Aztec Bookstore and Education – Planned Electrical Outages - On 08/23/2024

    As part of the campus electrical upgrades project, a planned electrical outage for the Aztec Bookstore and Education buildings is required. There will be periodic construction personnel traffic in and around the Aztec Bookstore Electrical Yard throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Aztec Bookstore and Education buildings will be closed to the public throughout the outage window detailed below. ** Duration of Impacts: Start Time / Date: 03:30 AM, Friday, August 23rd, 2024 End Time / Date: 07:30 AM, Friday, August 23rd, 2024

  • Electrical Infrastructure Upgrade Notification

    Avenue of the Arts - On 08/13/2024

    Due to a crane pick activity scheduled to place a rooftop transformer on the roof of the Storm Hall building, the west portion of the Avenue of the Arts roadway will be closed to vehicular traffic for the duration specified below. The Pedestrian and ADA access paths will be maintained throughout the duration of work. Please heed the direction and instruction of flaggers in the area.

  • Electrical Infrastructure Upgrade Notification

    East Commons Way – Temporary Construction Traffic and Fencing - From 08/05/2024 to 09/06/2024

    Three ADA parking stalls on East Commons Way, parallel to the Atkinson Hall building, will be closed to facilitate construction material loading and unloading. There will also be construction traffic between the hours of work detailed below on East Commons Way, going into the electrical yard between Atkinson Hall and North Education. Additionally, there will be a small fenced-in area near the electrical yard outside of the North Education building, enclosing a temporary transformer. Please also be advised that the work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    East Commons Way - On 07/27/2024

    Due to a crane pick activity scheduled to place a rooftop transformer on the roof of the Aztec Bookstore building, the end of East Commons Way between North Education 60 and Charles B. Bell Jr. Pavilion will be temporarily closed to pedestrian and vehicular traffic for the duration specified below. Please heed the direction and instruction of flaggers in the area.

  • Electrical Infrastructure Upgrade Notification

    Aztec Bookstore and Education – Planned Electrical Outages - From 07/27/2024 to 07/29/2024

    As part of the campus electrical upgrades project, planned electrical outage for the Aztec Bookstore and Education buildings are required. There will be periodic construction personnel traffic in and around the Aztec Bookstore Electrical Yard throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Aztec Bookstore and Education buildings will be closed to the public throughout the outage window detailed below. **

  • Electrical Infrastructure Upgrade Notification

    Aztec Bookstore and Education – Planned Electrical Outages - From 07/27/2024 to 07/29/2024

    As part of the campus electrical upgrades project, planned electrical outage for the Aztec Bookstore and Education buildings are required. There will be periodic construction personnel traffic in and around the Aztec Bookstore Electrical Yard throughout the entire duration of the work. The outage will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the buildings and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Aztec Bookstore and Education buildings will be closed to the public throughout the outage window detailed below. **

  • Electrical Infrastructure Upgrade Notification

    Atkinson Hall, Aztec Bookstore, Education, North Education/North Education 60 - From 07/22/2024 to 08/02/2024

    Three ADA parking stalls on East Commons Way, parallel to the Atkinson Hall building will be closed to facilitate construction material loading and unloading. There will also be construction traffic between the hours of work detailed below on East Commons Way going into the electrical yard near Aztec Bookstore.

  • Electrical Infrastructure Upgrade Notification

    Aztec Bookstore (BOOK) - On 07/19/2022

    Investigation of motor control center affecting users of Aztec Bookstore (BOOK) from 7:30 AM to 9:30 AM on July 19th, 2022.