Aztec Bookstore (BOOK) - On 07/19/2022
SUMMARY OF IMPACTS:
- BASEMENT FLOOR MECHANICAL ROOM OCCUPIED
- HVAC IMPACTED IN 2-5 MIN DURATIONS
__________________________________________________________
IMPACT NOTIFICATION:
To: Aztec Bookstore (BOOK)
From: Sarah Abdellatif, Substation A Communication Specialist/ Program Analyst
Please be advised that Planning, Design & Construction will be continuing a project that may impact you. Below are the details of the scope of work and anticipated impacts:
Scope of Work: Brief shut down of motor control center within mechanical/electrical equipment room.
Reason for Project: Investigate breaker sizes for future work associated with the Electrical Infrastructure Upgrades Project.
Anticipated Impacts: Mechanical systems in Aztec Bookstore will be impacted in 2-5 min durations corresponding to the breaker section being shut down, resulting in a brief lack of air flow and/or temperature control in rooms within the facility.
All physical work will be conducted at the motor control center panel located within facility mechanical/electrical equipment room.
Start Time / Date: 07:30 AM, Tuesday, July 19, 2022
End Time / Date: 09:30 AM, Tuesday, July 19, 2022
Contact: Please direct any questions or concerns to Sarah Abdellatif, Substation A Communication Specialist/Construction Program Analyst at (858)888-3215 or [email protected]. For questions about health and safety measures, please contact Gillian Marks, Senior Director of Environmental Health & Safety at (619) 594-2853 or [email protected].