Previous Notifications

Impact Notifications are Listed Chronologically

Arts & Letters (AL)
  • Electrical Infrastructure Upgrade Notification

    Avenue of the Arts - On 08/13/2024

    Due to a crane pick activity scheduled to place a rooftop transformer on the roof of the Storm Hall building, the west portion of the Avenue of the Arts roadway will be closed to vehicular traffic for the duration specified below. The Pedestrian and ADA access paths will be maintained throughout the duration of work. Please heed the direction and instruction of flaggers in the area.

  • Electrical Infrastructure Upgrade Notification

    Avenue of the Arts - From 08/05/2024 to 08/30/2024

    Due to ongoing electrical upgrades within the Storm Complex (Aztec Shop Terrace, Nasatir Hall, Storm Hall, and Storm Hall Terrace) buildings, the west portion of the Avenue of the Arts roadway near the electrical yard will be closed to pedestrian and vehicular traffic for the duration specified below. There will be construction fencing and delineation to close off the area. ADA access paths of travel are not anticipated to be impacted.

  • Electrical Infrastructure Upgrade Notification

    REMINDER - Arts & Letters and Parking Lot 14 - On 07/26/2024 and 08/06/2024

    As part of the campus electrical upgrades project, planned electrical outages for the Arts & Letters building and parking lot 14 are required. There will be periodic construction personnel traffic in and around the Arts & Letters building throughout the entire duration of the work. The outages will entail a total loss of power for the durations specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outages, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please also note that the Arts & Letters building and parking lot 14 will be closed to the public throughout the outage window detailed below. ** Duration of Impacts: The outage schedule is as follows: 1. On Friday, July 26th, 2024, from 2:00 am to 6:00 am 2. On Tuesday, August 6th, 2024, from 2:00 am to 6:00 am

  • Electrical Infrastructure Upgrade Notification

    UPDATE - Avenue of the Arts & Facilities Services North Driveway - 01/11/2024 - 02/09/2024

    Medium voltage cable pulling work will require vehicular access on Avenue of the Arts to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the East end of the Driveway. Please be advised that work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    UPDATE - Avenue of the Arts & Facilities Services North Driveway - 01/11/2024 - 01/19/2024

    Medium voltage cable pulling work will require vehicular access on Avenue of the Arts to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the East end of the Driveway. Please be advised that work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    Avenue of the Arts & Facilities Services North Driveway - 01/08/2024 - 01/12/2024

    Medium voltage cable pulling work will require vehicular access on Avenue of the Arts to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Access to COGEN and Facilities Services will be maintained through the East end of the Driveway. Please be advised that work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    Avenue of the Arts Vehicular and Pedestrian Impacts - From 06/19/2023 to 08/07/2023

    Trenching and underground utility work will require vehicular access on a portion of Avenue of the Arts to the South of Art (I) South to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. The parking spaces between Hardy Tower and Professional Studies & Fine Arts (PSFA) will be closed, and access to the staircase in the Arts & Letters building will be limited to one staircase at certain times during the designated duration. The exact start and end dates will be announced in advance. Please be advised that work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    UPDATE - Avenue of the Arts Vehicular and Pedestrian Impacts - From 06/19/2023 to 08/13/2023

    Trenching and underground utility work will require vehicular access on a portion of Avenue of the Arts to the South of Art (I) South to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. The parking spaces between Hardy Tower and Professional Studies & Fine Arts (PSFA) will be closed, and access to the staircase in the Arts & Letters building will be limited to one staircase at certain times during the designated duration. The exact start and end dates will be announced in advance. Please be advised that work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    Aztec Circle Drive Temporary Impacts (Near Facilities Services) - From 05/22/2023 to 06/02/2023

    Trenching and underground utility work will require vehicular access on a portion of Aztec Circle Drive to the North of the Art North (Art N) building to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Please be advised that work will result in localized dust and noise.

  • Electrical Infrastructure Upgrade Notification

    Arts & Letters (AL), Art South (ART S), Life Sciences North (LS N), Professional Studies & Fine Arts (PSFA) - On 02/22/2022

    Temporary impacts to Avenue of Art Lane affecting users of Arts & Letters (AL), Art South (ART S), Life Sciences North (LS N), Professional Studies & Fine Arts (PSFA) on February 22,2022 from 6:30 AM to 10:30 AM.