Previous Notifications
Impact Notifications are Listed Chronologically
UPDATE - Facilities Services North Driveway and Loading Area Impacts - From 05/08/2023 to 06/06/2024
May 8The designation of laydown areas and construction of New Substation A will eliminate use of parking spaces and generate construction traffic for loading/unloading of materials in the driveway and loading area north of the Facilities Services (FS) building. The ADA accessible parking stall on the north driveway will not be available. ADA parking and access to the building will be maintained at the south entrance of Facilities Services. ADA access to the Granger Loading Dock through the Exterior Wheelchair Lift located on the north driveway may be periodically unavailable throughout the construction duration. To coordinate access, please reach out to Alejandro Rivera at 858.248.5739 or [email protected].
Closure of Parking Spaces in Lot 16 - 05/08/2023 - 04/30/2025
May 8Closure of multiple parking spaces in a portion of the Northern corner of Lot 16. Along with the installation of construction trailers and construction fencing, a portion of the lot will require pavement restriping and signage to redirect vehicular traffic flow.