Previous Notifications
Impact Notifications are Listed Chronologically
Avenue of the Arts Vehicular and Pedestrian Impacts - From 06/19/2023 to 08/07/2023
Jun 19Trenching and underground utility work will require vehicular access on a portion of Avenue of the Arts to the South of Art (I) South to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. The parking spaces between Hardy Tower and Professional Studies & Fine Arts (PSFA) will be closed, and access to the staircase in the Arts & Letters building will be limited to one staircase at certain times during the designated duration. The exact start and end dates will be announced in advance. Please be advised that work will result in localized dust and noise.
UPDATE - Avenue of the Arts Vehicular and Pedestrian Impacts - From 06/19/2023 to 08/13/2023
Jun 19Trenching and underground utility work will require vehicular access on a portion of Avenue of the Arts to the South of Art (I) South to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. The parking spaces between Hardy Tower and Professional Studies & Fine Arts (PSFA) will be closed, and access to the staircase in the Arts & Letters building will be limited to one staircase at certain times during the designated duration. The exact start and end dates will be announced in advance. Please be advised that work will result in localized dust and noise.
Aztec Circle Drive Temporary Impacts (Near Facilities Services) - From 05/22/2023 to 06/02/2023
May 22Trenching and underground utility work will require vehicular access on a portion of Aztec Circle Drive to the North of the Art North (Art N) building to be limited to one lane throughout the duration of work. Vehicular thru-traffic will be maintained by flagmen directing traffic in alternating directions and alternate pedestrian/accessible paths will be delineated by signage, flagmen and traffic control. Please be advised that work will result in localized dust and noise.
Art South (ART S), Donald P. Shiley Bioscience Center (BSCI), Engineering & Interdisciplinary Sciences, Facilities Services (FS), Life Sciences North (LS N) - on 02/23/2022
Feb 23Temporary impacts to Aztec Cir Dr & Avenue of Art Lane affecting users of Art South (ART S), Donald P. Shiley Bioscience Center (BSCI), Engineering & Interdisciplinary Sciences, Facilities Services (FS), Life Sciences North (LS N) from 6:30 AM to 10:30 AM on February 23rd, 2022.
Arts & Letters (AL), Art South (ART S), Life Sciences North (LS N), Professional Studies & Fine Arts (PSFA) - On 02/22/2022
Feb 22Temporary impacts to Avenue of Art Lane affecting users of Arts & Letters (AL), Art South (ART S), Life Sciences North (LS N), Professional Studies & Fine Arts (PSFA) on February 22,2022 from 6:30 AM to 10:30 AM.