Upcoming Impacts
Adams Humanities, Dramatic Arts, Ellen Ochoa Pavilion, Extended Studies Center, Music, Student Services East, Student Services West - On 11/02/2024
Nov 2As part of the campus electrical upgrades project, a planned electrical outage for the buildings is required. The outage will entail a total loss of power for the duration specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outage only impacts systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Please also note that the building will be closed to the public throughout the outage window detailed below. **
Adams Humanities, Dramatic Arts, Ellen Ochoa Pavilion, Extended Studies Center Music, Student Services East, Student Services West, Prebys Stage and Parking 6 - On 11/02/2024
Nov 2As part of the campus electrical upgrades project, a planned electrical outage for the buildings is required. The outage will entail a total loss of power for the duration specified below, affecting systems such as heating and air, lighting, receptacle convenience power, card/access/access control, elevators, etc. It is highly recommended that sensitive equipment unable to withstand an outage should be unplugged or powered down the day before to avoid unanticipated impacts to the equipment during the outage window. After the outage, users will be able to re-enter the building and confirm that power is restored, and systems are fully functional. Any issues should be communicated immediately to the project team using the contact information provided at the end of this notification. ** Please note that the outage only impacts systems and equipment not supported by the emergency generator. Any equipment plugged into designated outlets supported by the emergency generator will only experience a brief interruption. Please also note that the building will be closed to the public throughout the outage window detailed below. **
Adams Humanities, Dramatic Arts, and Music Building - From 11/01/2024 to 11/04/2024
Nov 1As part of the campus electrical upgrades project, heating hot water will be temporarily unavailable during the interruption window noted below. Please be aware that affected buildings may experience cooler than normal temperatures during this time.
Loss of Redundancy in Power Generation - Substation B - On 10/08/2024
Oct 8Occupants should be aware that normal cogeneration redundancy will be temporarily unavailable for Substation B. Although the likelihood of a utility interruption during this maintenance period is low while the campus is utilizing power from SDG&E, it is recommended that any sensitive equipment be shut down prior to the scheduled maintenance period in an abundance of caution.