Apr 1Please be advised that the end date and time for the work have been extended. In addition to all previously communicated information, a portable construction restroom will be installed in front of room 122D for construction personnel. Any work within specific occupied spaces will continue to be coordinated with room users prior to the work taking place.
Engineering - From 04/01/2024 to 04/12/2024
Apr 1Work associated with setting up temporary power will necessitate construction personnel to occupy rooms 101E, 103, 103B, 103C, 104, 118, 118A, 122B, 123A, 130, 132A, 202G, 325 throughout the duration of work. Please be advised that work will result in localized dust and noise, but there are no anticipated impacts to any building systems.
Life Sciences South - From 02/26/2024 to 02/28/2024
Feb 26Installation of fire alarm conduits will necessitate construction personnel to occupy electrical rooms 195 and 195A throughout the duration of work. Work will not cause any shutdown or outages to any building systems. Please be advised that work will result in localized dust and noise.