Aztec Circle Drive - On 08/12/2024

image

To: All Campus Users

From: Sarah Abdellatif, Substation A Communication Specialist/Program Analyst

Please be advised that Planning, Design & Construction will be performing a project that may impact you. Below are the details of the scope of work and anticipated impacts:

Scope of Work: Installation of transformer on the North Education building rooftop in support of building electrical upgrades.

Reason for Project: Work associated with the Electrical Infrastructure Upgrades project in support of current campus needs and future growth.

Anticipated Impacts: Due to a crane pick activity scheduled to place a rooftop transformer on the roof of the North Education building, the southeast portion of the Aztec Circle Drive roadway and the sidewalks parallel to Atkinson Hall and North Education along Aztec Circle Drive will be closed to pedestrian and vehicular traffic for the duration specified below. The Pedestrian and ADA access path along the buildings and Aztec Circle Drive will be periodically interrupted for a short duration while the crane travels over the path.  Please heed the direction and instruction of flaggers in the area.

Duration of Impacts:

Start Time / Date: 6:00 am, Monday, August 12th, 2024

End Time / Date: 10:00 am, Monday, August 12th, 2024

Contact:  Please direct any questions or concerns to Sarah Abdellatif, Substation A Communication Specialist/Construction Program Analyst at (858) 888-3215 or [email protected]. For questions about health and safety measures, please contact Gillian Marks, Senior Director of Environmental Health & Safety at (619) 594-2853 or [email protected].

For more details about this impact, please visit the website. This notification along with all other notices regarding the Electrical Infrastructure Upgrades (EIU) Project will be posted and archived for ease of reference on the EIU website.