SUMMARY OF IMPACTS:

  • AVENUE OF ART VEHICULAR IMPACTS
  • AZTEC CIRC DRIVE VEHICULAR IMPACTS
  • E COMMONS WAY VEHICULAR IMPACTS
  • PLANETARIUM COURT VEHICULAR IMPACTS
  • PEDESTRIAN SIDEWALK DETOUR
  • PARKING IMPACTS

__________________________________________________________

IMPACT NOTIFICATION:

To: Campus Users near Facilities Services (FS), Donald P. Shiley BioScience Center, Life Sciences North (LS N), Geology / Mathematics / Comp. Science (GMCS), Industrial Technology (IT), Atkinsons Hall, Physics, East Commons (EC) & North Education (NE)

From: Sarah Abdellatif, Substation A Communication Specialist/ Program Analyst

Please be advised that Planning, Design & Construction will be continuing a project that may impact you. Below are the details of the scope of work and anticipated impacts:

Scope of Work:  Potholing to investigate underground utilities prior to project start date.

Reason for Project:  To investigate design impacts caused by conduit pathways and cables in support of the Electrical Infrastructure Upgrades Project.  

Anticipated Impacts:  Rigging equipment and vendor trucks will temporarily obstruct or limit pedestrian and/or vehicular access to the NE corner of Campus near Aztec Cir Dr, E Commons Way, and Planetarium Ct. There will be a range of minor impacts that reroute the normal pedestrian routes and vehicular traffic.  Additional impacts to parking spaces and accessible pathways will be periodically unavailable for a couple hours during the dates/times specified below:

  • April 13th, 2022, to April 15th,2022: The 5 standard parking spaces and 1 ADA parking space north of the Facilities Services building will periodically be unavailable.
  • April 18th, 2022, to April 27th, 2022: The 1 ADA parking space at the Facilities Services building will be periodically unavailable.
  • April 22nd, 2022, to April 29th, 2022: The 7 standard parking spaces on the east side of the Donald P. Shiley Biosciences/Life Sciences North service yard area will be periodically unavailable. The accessible curb cut ramp on the north side sidewalk of Donald P. Shiley Bioscience will be temporarily obstructed. Alternate accessible routes through the Life Sciences South (LS S) can be used to cross from Avenue of Arts to the east side of Aztec Circle Dr.

Start Time / Date:   06:30 AM, Wednesday, April 13, 2022

End Time / Date:      5:00 PM, Friday, May 6, 2022

Note that users should expect impacts and the presence of traffic control signage and cones periodically throughout the entire duration of the work identified.

Contact:  Please direct any questions or concerns to Sarah Abdellatif, Substation A Communication Specialist/ Construction Program Analyst at (858)888-3215 or [email protected]. For questions about health and safety measures, please contact Gillian Marks, Senior Director of Environmental Health & Safety at (619) 594-2853 or [email protected].